Central public works department & PWD.
  • A 5 star Green GRIHA rated CPWD project named International Center for Environmental Audit and Sustainable Development for CAG (Comptroller Audit General of India) at Jaipur, the completion cost around 63 cr. The project is highly prestigious & time bound and state of excellence. The work constitutes of total development of area (plot) 65000 sqm, the campus comprises 13 independent structure/blocks, with academic block, hostel blocks, Bunglows, sports blocks (club), transit blocks, supports staff, service block ,Auditorium etc. with total built up area of around 25000 sqm. The project was dream project of CAG of India sh vindo Rai who got inaugurated the project by Vice-president of India on 04th May 2013, which was highly appreciated by V.P and the state governor too.


    All the work has been executed with highly superior specifications (a state of excellence) such as superior marble flooring and Italian marble at some places, UPVC windows with DGU glass, Dry sand stone cladding on hilti clamps, PUF insulation treatment at terrace and XPS boards in walls, modular cupboards and kitchen, false ceiling with HVAC ducts, SS railings, Metal Canopy with ACP and SS cladding over 3 dimensional MS truss installed at height of around 10-12 mtrs in 3 blocks, frame less glass door and DGU panel in structural glazing at entrances, acoustic finishes in auditorium. Installation of Lifts cladding and landscaping works, MS pergola with walkways etc. (approx completion cost 63.00 cr)


  • The work of C/o Central Academy for Police Training (CAPT) at Kanhasaiya, Bhopal, the work compromises of C/o Sr. Officers Mess, GO Mess, Inspector / Sub Inspector Mess and Girls Hostel (Ministry of Home affaire) (Estimated cost – Rs 40.00cr)

  • An underground parking solution project at Nirman Bhawan, Delhi,(headquarter of ministry of UD) where 5 ministers have their office i.e. High security zone.The work was otherwise normal construction But the peculiarity of work was construction of two (-2) underground level parking so near to existing 8 storeyed building, the distance of the parking from the existing building was mere 6.5 mtrs and 7.5 mtrs from the two sides. The excavation work was taken up after developing Temporary Earth retaining structure (soldier/sheet Piling) comprising 650 MT of structural steel work and pile work, the presence of sub soil at -5.5 mtrs made the work more challenging and riskier, all the structure from -8.5 mtrs to 00 level was executed by continuous round the clock dewatering for the structural safety of the structure. The project was inaugurated and praised by H’onable Urban Development minister on 8th May 2013. (approx completion cost 19.00 cr)

  • The project consists of construction of an Elevated road/flyover of about span 18 mtrs by cast in situ pilling (1000mm dia.) of 24 meter depth & placing pre-cast girders and precast planks to be permanent shuttering for RCC deck slab, crash barrier, expansion joints treatment etc and finally bituminous road and mastic work for the vehicular movement along the dental college AIIMS, Delhi. (approx completion cost 25.00 cr)

  • Completed a national Prestigious Common wealth 2010 project, the 6 nos Sub Stations & Bldg at JLNS under COMMON WEALTH 2010, which include high storing capacity of water tanks 12-15 lac lit & Modern substations for the Games. (up dated cost of completed work around 20.00 cr)

  • Has also completed a Media accommodation Hostel block for Foreign Media visiting for COMMON WEALTH 2010 PROJECT at JLNS, Delhi, which include very rich finishing items (updated cost of completed work 20.00 cr)

  • Also achieved the impossible task of completing 3 nos dormitory double storey with pilling in mere 4 month at Millennium DTC depot (sarai kale khan. Delhi) for COMMON WEALTH 2010

  • Constructed the Multistoried Boys Hostel (800 rooms) at IIT roorkee, a highly praised building with dining hall of around 1200 sqm with waffle/coffer slab. (cost of completed work 25.00 cr)

  • Completed the work of fire station bldg. at rohini project complete before time 3 months and earn incentive

  • Prestigious time bound World Bank project of NATP of basement plus four-storied RCC frame structure building including all finishes and external development works at pusa was completed in mere 10 months completed in year 2004.

  • Prestigious time bound World Bank project of NATP of basement plus four-storied RCC frame structure building including all finishes and external development works at pusa was completed in mere 10 months completed in year 2004.

  • Lawyers chamber work at Delhi high court.

  • Typical work construction of additional rooms & bathrooms at existing staff type-IV qtrs of judges & SDM at Gulabi bagh was executed to the satisfaction of SDM’s & Judges.